1. Preparation before starting:
Clean the whole machine before starting, check any abnormalities in each mechanical and electrical system, check the water seal flume water level and temperature(40-50℃, deionized water), confirm the take-up spool size and arrange the breadth of traversing and take-up shaft mat as per requirement, set brush for the pay-off device as the requirement.
2. Set up the annealing temperature and oven temperature.
3. Place the rough disk on each pay-off position of the pay-off rack, cover the brush pay-off, run the auxiliary haul-off wheel and haul-off drum at a low speed, turn on the high-air volume blower, and thread the wires one by one according to the threading diagram.
4. Rough adjustment for the reeling tension around 200V, based on the reeling shaft model and wire vector set up the take-up motor speed.
5. When the annealing furnace reaches the required temperature, adjust the speed to the technique's requirement.
6. Check the wire quality, final adjust each parameter, winding tension force, and traversing, and start regular operation.
7. Pay attention to the point listed below:
A. whether the wire pay-off smoothly
B. Water sink temperature
C. Soften grade of the annealing copper wire