sunman@mentorsmachinery.com    +8613962242532
Cont

Have any Questions?

+8613962242532

Sep 08, 2023

Copper Wire Annealing And Tinning Machine Operation Steps and Precautions

1.Preparation before start:

1.1 Clean the whole Annealing and Tinning Machine before start, check any abnormal of each mechanical and electrical system, check water seal flume water level and temperature(40-50℃, deionized water), confirm the take up spool size and arrange the breadth of traversing and take up shaft mat as per requirement, set brush for the pay off device as requirement.

1.2 Set up the annealing temperature, oven temperature.

1.3 Place the rough disk on each pay-off position of the pay-off rack, cover the brush pay-off, run the auxiliary haul-off wheel and haul-off drum at a low speed, turn on the high-air volume blower, and thread the wires one by one according to the threading diagram.

1.4 Rough adjustment for the reeling tension around 200V, base on the reeling shaft model and wire vector set up the take-up motor speed.

1.5 When the annealing furnace reach the required temperature, adjust the speed as techniques requirement.

1.6 Check the wire quality, final adjust each parameter, winding tension force and traversing, start normal operation.

2. Pay attention to the point listed below:

A. Whether the wire pay-off smoothly

B. Water sink temperature

C. Soften grade of the annealing copper wire

D. Wire diameter and flatness of the wire traversing

E. Wire take-up tension

Above are the operation steps and precautions of our Annealing And Tinning Machine,for more machine technical parameters, please contact:sunman@brwiremachine.com

annealing and tinning machine

Send Inquiry